foto Apart from providing the municipality with public services and infrastructure
this must be carried out within the framework of sustainability.

DEFINITION OF PUBLIC INFRASTRUCTURE
Public infrastructure or works is all that whose purpose is to create, renew or construct goods which provide a social service which an Administration takes on itself or through contracts with individuals, such as the drinking water system, drainage, rain water drainage, street lighting, pavements, roads, public buildings, etc.

DUTIES OF THE INFRASTRUCTURE DEPARTMENT
• Drawing up projects for carrying out public works.
• Project management of the public works promoted by the Town Hall.
• Technical Supervision of the public works carried out by other
Public Administrations.
• Relations with other public administrations (Autonomic Gobernement, Provincial Community, Ministry of Development, etc.)
• Drafting of documents.
• Reports on the public works projects to be carried out by other
administrations.
• Management of subsidies.
• Public attention service


WORKS UNDERWAY
• Upgrading and improving the Rincón de la Zofra. (TOWN HALL)
• Construction of an artificial turf Football Pitch and re-urbanisation of the
surroundings of the el Vincle sports centre. (TOWN HALL)
• Lighting of the El Vincle artificial turf football pitch (TOWN HALL)
• Lighting of the Camino La Vila (TOWN HALL)
• Upgrading and improving the Leisure Area of the Plaza Don Carlos (COUNCIL)
• Sanitation of Amerador. (PROAGUAS)
• Improving the drinking water network. (MUNICIPAL WATERS)
• Opening a subterranean access in Amerador. (IFGV)
• Pedestrianisation of the Amerador level crossing. (IFGV)
• MOTORWAY construction (Ministry of Development)
• Sectorial and specific works controlled by the department:

UA/13
- SUP/5
- SUP/6
- Car Park Avda. Furs
- opening of the Cartagena and Juan Cierva streets

Future Projects

- Alternative Energies and the reduction of C02 gas emission in collaboration with other Departments.

CONTACT

Área de Public Infrastructure

{0>Concejal:<}100{>Councillor:<0} {0>Elizabeth Basto Gomez<}0{>Elizabeth Basto Gomez<0}

 

{0>Edificio de Urbanismo
Plaza de Canalejas, 3. Planta 2a
03560 El Campello.
<}0{>Town Planning Building
Plaza de Canalejas, 3. 2nd floor
03560 El Campello.<0}

 

{0>Tel.:<}0{>Tel.:<0} {0>965.63.72.00
Extensiones:
<}0{>965.63.72.00
Extensions:<0}
{0>- Información general:<}0{>- General information:<0} {0>421 y 607
- Secretaría concejalía:
<}0{>421 and 607
- Department secretary:<0} 460

 

{0>Horario de atención al público
Los miércoles de 10:00 a 14:00 horas, previa cita.
<}0{>Customer service timetable
Wednesdays from 10am to 2pm, on appointment.<0}

 

{0>Personal
Jefe de la Oficina:
<}0{>Personnel
Head of Office:<0}
{0>- Francisco J. Pastor (Arquitecto)

Técnicos Adjuntos:
<}0{>- Francisco J. Pastor (Architect)

Assistant Technicians:<0}
{0>- Laura CUment (Ingeniera Tec. Obras Públicas)
- Milagros Espinós (Ingeniera Tec. Obras Públicas)
- Joaquin Esteso (Ingeniero Téc. Industrial)
- Gabriel González (Ingeniero Téc. Topografía)
- Delineante

Jefe de Negociado:
<}0{>- Laura Climent (Civil Works Technical Engineer)
- Milagros Espinós (Civil Works Technical Engineer)
- Joaquin Esteso (Industrial Technical Engineer)
- Gabriel González (Topographic Technical Engineer)
- Draughtsman

Head of Department:<0}
{0>- Victoria Pérez (Administrativo)
- Mónica (Auxiliar Administrativo)
<}0{>- Victoria Pérez (Assistant)
- Mónica (Administrative Assistant)<0}


NOTICIAS

26/10/2018
TRAM d’Alacant recupera el 29 de octubre el servicio ferroviario entre Cala Piteres y Creueta
•   FGV ha completado en el plazo previsto las obras de rehabilitación del viaducto del barranco d’Aigües

•   El transporte alternativo de autobús en este tramo deja de circular desde el próximo lunes

-->
16/10/2018
El Campello recibe los Fondos FEDER solicitados para la redacción del Plan de Movilidad Urbana Sostenible.
26/9/2018
La rehabilitación del viaducto del barranco de Aigües obligará a cerrar el tramo entre las estaciones de Cala Piteres y la Vila Joiosa del TRAM d’Alacant
•   Los trabajos comenzarán el 3 de octubre y se ofrecerá servicio alternativo de autobús para unir las paradas afectadas de la Línea 1 

•   La interrupción del servicio está previsto que se prolongue hasta el 28 de octubre

-->
+ más noticias

© Ajuntament del Campello | ayuntamiento@elcampello.org | legal notice | accessibility | site map
C/ Alcalde Oncina Giner, 7 - Telephone 96 563 72 00 - Fax 96 563 29 82 - 03560 El Campello (Alacant)
Page designed by Tres Tristes Tigres
Translation into English by CONFIRMA GLOBAL SERVICES S.L.

W3C XHTML 1.0 W3C CSS W3C WAI-AA WCAG 1.0